Heavy-Duty Long Rope Training & Running Leash for Dogs

Heavy-Duty Long Rope Training & Running Leash for Dogs

Black / S 1.5m
$17.99
Sale price  $17.99 Regular price  $45.00
Skip to product information
Heavy-Duty Long Rope Training & Running Leash for Dogs

Heavy-Duty Long Rope Training & Running Leash for Dogs

$17.99
Sale price  $17.99 Regular price  $45.00
Color
Size

?Description:

  • LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
  • GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
  • LONG DOG LEAD-? Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs

Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI

Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead

You may also like